Lifting screws from Röchling Industrial Oepping are manufactured from the high-performance plastic Robalon®. For over 60 years, we have been processing and refining this material, which is used in many industries worldwide. Robalon® is a sintered plastic consisting of ultra-high-molecular-weight low-pressure polyethylene (UHMW-PE), alloyed with molybdenum disulfide, cross-linking agents, and UV stabilizers, and produced using a special long-term sintering process. For this reason, RobaScrew lifting screws are characterized by maximum abrasion resistance, reliability at low temperatures, chemical resistance, and a long service life.
Unlike conventional steel screws, minor damage to RobaScrew lifting screws is not a problem, as there is no corrosion protection that could be compromised. The minimal clearance required for RobaScrew lifting screws in the steel trough has a positive effect on efficiency — especially when compared to classic steel lifting screws. Combined with their significantly lower weight, RobaScrew lifting screws achieve a higher hydraulic efficiency than conventional steel screws, depending on the water level.
Read the results of the study conducted by BOKU Vienna here:

The Röchling Engineering Team develops the best possible solution for the screw pump system based on the specific requirements for flow rate and head at the site.
- Single-, double-, or triple-screw models
- Models for hazardous areas
- Flow rates up to 260 L/s
Versatile application
Suitable for both new construction and retrofitting in existing structures as part of renovation projects in a trough-in-trough configuration.
Corrosion-resistant construction
The trough and all steel components are made entirely of stainless steel—for high durability, low maintenance, and optimal performance even in demanding environments.
Variable drive solutions
Available with either direct drive including a torque support or with an external drive motor and maintenance-free drive shaft with a flexible coupling for quiet and reliable operation.
Maintenance-friendly bearings
Central lubrication for upper and lower bearings; bearings easily accessible for simple maintenance.
Reliable installation
RobaScrew compact screw conveyors are installed by the in-house RobaServ service and installation team—for maximum safety, short installation times, and minimal downtime.
The rehabilitation of concrete troughs, with or without steel linings, represents a significant expense for operators. The Robalon® trough liner provides a quick and cost-effective solution to get the trough back up and running quickly.
Corrosion-resistant functional layer
Low-friction and safe operation thanks to a plastic lining made of abrasion-resistant UHMW-PE.
Covers unevenness
Smooths out minor chips and unevenness in the trough.
Easy maintenance
An integrated visual wear indicator detects application-related wear at an early stage. Replacement can be performed without dismantling the screw, minimizing downtime and maintenance costs.
Since the wastewater treatment plant was built in 1993, steel augers had been in use for the return sludge, and these had been subjected to heavy wear and tear over the decades. Corrosion, material fatigue, and increasing maintenance requirements made it increasingly clear that a sustainable solution was needed.
The ongoing operation of the wastewater treatment plant could not be interrupted at any time. Consequently, the time window for replacing the screws was extremely tight. Therefore, a solution was needed that was a perfect fit, quick to install, and permanently reliable.
After taking precise on-site measurements, the decision was made to install the RobaScrew compact lifting screw in a trough-in-trough configuration. This design allows the old screws to be replaced without having to laboriously dismantle the existing reinforced concrete trough—a decisive advantage for an efficient retrofit. Installation was carried out by the Röchling service team and was completed within 1.5 days.
Along with the new RobaScrew compact screw conveyors, a modern drive system with variable-frequency drive control was installed. The result: energy savings of 48,000 kWh per year, a reduction of 18.3 tons of CO2, significantly lower maintenance requirements, and high corrosion resistance thanks to Robalon®.
In Olbernhau, the existing lifting screws in the feed section had become worn after many years of operation and were to be replaced as part of a modernization project. At the same time, the trough required refurbishment. The system consisted of two screws with a diameter of 500 mm and a flighted length of 7,000 mm.
The planned Robalon® trough lining reduced the available diameter for the screws. Nevertheless, the required conveying capacity of 25 l/s still had to be reliably achieved.
Precisely manufactured RobaScrew lifting screws were used, which were optimally matched to the new trough lining. The custom-designed construction enabled quick and smooth installation within a tight timeframe.
Since commissioning, the system has impressed with its quiet, smooth, and efficient operation. The combination of RobaScrew lift screws and trough liner ensures reliable conveying and a robust, long-term solution.

Mühltal 水处理协会高级管理
“ROBALON 螺旋运输机为我节省了可观的维护和维修成本。 我无需再维护油脂润滑泵,省却了油脂成本。 曾经螺旋运输机的轻微损坏会破坏防腐保护,如今却不足为惧。”

Eisenstadt 废水协会
“我对整个螺旋运输机翻新的表现非常满意。 我得到了承诺的一切。 两个 ROBALON 回流螺旋运输机从一开始就运行良好。 耐用性则将在未来几年得到体现。”

Meisl GmbH 高级管理
“与 Röchling Leripa 公司的合作对我们公司非常有益,通过 ROBALON 螺旋运输机为我们开辟了全新活动领域。”
Dipl.-Ing. Eitler & Partner Ziviltechniker GmbH 规划师
“除了对能源效益的现有研究外,重量轻、成本效益高的翻新和组装要求以及几乎免维护的轴承也是我选择 ROBALON 螺旋运输机的关键原因。”

Matthias Baumgartner